Flooring

KingFloor EP50T®

Heavy duty epoxy topping for floor surfaces.

SpecWorld has the Spec Pack, CSI specification and drawings for registered specifiers.

Tensile strength BS 6319, Part 7
≥ 15 MPa @ 7 days
Shore D hardness ASTM D2240
≥ 80 @ 7 days
Pot life
1 hr
Mixed density
2.10 ± 0.05 g/cm³

Overview

KingFloor EP50T is a three-pack solvent free, epoxy- based topping that provides floor surfaces with a seamless, hygienic and cosmetically attractive finish.

KingFloor EP50T is applied by trowel and can be coved and laid to falls and has a very good durability towards pedestrian and vehicular traffic.

It also has very good resistance towards many of the chemicals commonly found in an industrial environment (consult our Technical department for further details).

KingFloor EP50T has a finish that provides very good slip resistance and can be supplied in a natural colour and variety of colours, it is also available in a decorative quartz finish (consult our Sales Department for details).

Where to use

KingFloor EP50T is used to provide a hygienic, dense and extremely hard wearing surface for concrete floors for a wide range of applications such as:

  • Heavy industry factories.
  • Aircraft hangars.
  • Paint workshops.
  • Steel works.
  • Dairies.
  • Chemical factories.
  • Oil refineries.
  • Freezers and refrigerated storage with temperatures down to -25˚C (consult KINGKRETE's technical department for more details).

Why use it

  • Extremely hard wearing system.
  • Solvent free.
  • Non-slip.
  • Available in a wide range of attractive colours.
  • Available in a decorative quartz finish.
  • Resist a wide range of chemicals, consult KINGKRETE technical department for more details.

Technical properties

Values @ 25°C

Mixed density2.10 ± 0.05 g/cm³
Pot life1 hr
Compressive strengthBS 6319, Part 2ASTM C579≥ 85 MPa @ 7 days
Flexural strengthBS 6319, Part 3EN 13892-2≥ 30 MPa @ 7 days
Tensile strengthBS 6319, Part 7≥ 15 MPa @ 7 days
Shore D hardnessASTM D2240≥ 80 @ 7 days
Foot trafficAfter 24 hr
Vehicular trafficAfter 72 hr
Chemical curing7 days
Bond strength on C35/40
concreteASTM D4541
≥ 3.5 MPa @ 7 days
(substrate failure)
Maximum wear depthBS EN 13892-40.03 mm
Impact resistanceISO 6272-2> 20 N.m
VOC≤ 20 g/ltr

Standards and approvals

KingFloor EP50T complies with EN 13813, SR-B2.0- AR0.5-IR10.

How to use

Substrate preparation

The substrate must be clean, dry, even, dense and free from oil, grease, dust and other contaminants. A clean surface will ensure maximum adhesion between the substrate and the coating.

Concrete floors must have a minimum compressive strength of 25 N/mm² and a maximum concrete relative humidity of 80% (max. moisture content of 4%), relative humidity can be measured by using hygrometers.

Concrete relative humidity should be less than 80% for concrete of 28 days old or more, for low W/C ratio concrete floors, 80% hygrometer reading or less can be achieved before 28 days age.

Surface preparation

Unsound layers and contaminated concrete surfaces must be prepared using mechanical surface removing equipment. In case of areas deeply contaminated by oil or grease, such areas should be treated with hot compressed air.

Priming

Concrete substrates should be primed with KingFloor Primer. Use lambs wool roller to apply the primer. More than one coat may be required for highly porous or textured surfaces.

Work the primer well into the surface of the concrete and whilst the primer is wet, dress the surface with Anti-slip Aggregates #3 at the rate of 0.5 kg/m2 and allow to touch dry.

Another prime coat shall be applied just before applying the mixed KingFloor EP50T to ensure a strong bond between the primer coat and the top coat.

Mixing

Prior to mixing, stir the individual components of KingFloor EP50T, taking care to ensure that the bottom and sides are thoroughly scraped. Transfer the entire contents of the Base and Hardener into a separate mixing container.

Using a Jiffy-type mixer attached to a slow-running electrical drill, mix for approximately 2 minutes. Once mixed, transfer the entire contents into a Casco or Creteangle-type mixer, taking care to ensure that the bottom and sides are thoroughly scraped.

Start the mixer and transfer to it the entire contents of the KingFloor EP50T Filler container, taking care to ensure that these are completely dry and lump-free. Continue mixing for approximately 2 minutes.

Application

Once mixing is complete, transfer the KingFloor EP50T to the uncured primed surface and using a straight-edged steel trowel, apply it evenly. The use of KingRep Solvent when used to clean the trowel will also aid in producing a tight closed surface.

Important: When applying each kit of KingFloor EP50T, leave approximately 200 mm of the closest working edge untrowelled as this will help the blending in of the next kit.

Note: Avoid excessive trowelling as this can lead to marks resembling burns on the surface.

CHEMICAL RESISTANCE
Occassional Spillage after after full cure (7 days @ 25°C), ASTM D1308 (spot test @ 1 hr & 30°C)
BleachR
DetergentR
XyleneR
AcetoneR
White spiritR
Motor oilR
DieselR
PetrolR
Sulphuric Acid (25%)R
Hydrochloric Acid (10%)R
Nitric Acid (10% solution)R
Phosphoric Acid (50%)RS
Sodium Hydroxide (50%)R
Sodium Chloride
(saturated)
R
Brine (saturated)R

R: Resistant
RS: Resistant with slight discoloration

REMARKS

  • KingFloor EP50T should not be applied on to

surfaces known to suffer from damp rising.

  • KingFloor EP50T should not be applied at temperatures below 10°C or where ambient relative humidity exceeds 80%.

SEALING

To ensure that the surface is fully sealed, it is recommended that KingFloor EP50T is sealed with two coats of water based KingFloor WD. If the floor will be exposed to chemicals, two coats solvent based KingFloor EP25 is recommended. (see related data sheets for further details and chemical resistance tables).

Note: Please note that the application of a sealer will impair the slip resistance of the floor when subject to wet conditions.

Cleaning

KingFloor EP50T can be removed by KINGKRETE solvent prior setting.

Limitations and notes

  • Never mix KingFloor EP50T by hand as this could lead to areas of uncured material.
  • In certain cases the Base of the product can be supplied
  • uncoloured and needs the addition of a colour pack. In such cases, mix the components of the Base, Hardener and colour pack using same procedure above, then add the filler component accordingly.

Coverage, packaging and storage

Coverage

KingFloor EP50T: Approximately 3 m²/kit @ 5 mm thick.

KingFloor Primer: 5 m²/kg.

Packaging

  • KingFloor EP50T "natural" is available in 29.35 kg packs (14.7 litre).
  • KingFloor EP50T "coloured" is available in 30 kg packs (15 litre) including colour pack.
  • KingFloor Primer is available in 5 kg packs.

THICKNESS RANGE

5 mm and above.

Storage

Shelf life is 1 year when stored under cover, out of direct sunlight and protected from extremes of temperature. Failure to comply with the recommended storage conditions may result in premature deterioration of the product or packaging. For specific storage advice consult KingKrete's Technical Services Department.

Health and safety

As with all chemical products, care should be taken during use and storage to avoid contact with eyes, mouth, skin and foodstuffs. Treat splashes to eyes and skin immediately. If accidentally ingested, seek medical attention. Reseal containers after use. Use in well ventilated areas and avoid inhalation.