KingFloor EP100T®
Heavy duty epoxy topping for floor surfaces.
SpecWorld has the Spec Pack, CSI specification and drawings for registered specifiers.
- Compressive strength ASTM C579
- ≥ 95 MPa @ 7 days
- Flexural strength EN 13892-2
- ≥ 30 MPa @ 7 days
- Tensile strength BS 6319-7
- ≥ 17 MPa @ 7 days
- Shore D hardness ASTM D2240
- ≥ 80
Overview
KingFloor EP100T is a three-pack solvent free, epoxy- based topping that provides floor surfaces with a seamless, hygienic and cosmetically attractive finish.
KingFloor EP100T is applied by trowel and can be coved and laid to falls and has a very good durability towards pedestrian and vehicular traffic. It also has very good resistance towards many of the chemicals commonly found in an industrial environment (consult our Technical department for further details).
KingFloor EP100T has a finish that provides very good slip resistance and can be supplied in a natural colour and variety of colours, it is also available in a decorative quartz finish (consult our Sales Department for details).
Where to use
KingFloor EP100T is used to provide a hygienic, dense and extremely hard wearing surface for concrete floors for a wide range of applications such as:
- Warehouses.
- Paint workshops.
- Dairies.
- Chemical factories.
- Oil refineries.
- Freezers and refrigerated storage (at 5 mm thickness).
Why use it
- Extremely hard wearing system.
- Solvent free.
- Non-slip.
- Available in a wide range of attractive colours.
- Available in a decorative quartz finish.
- Resist a wide range of chemicals, consult KINGKRETE technical department for more details.
Technical properties
Values @ 25°C
| Mixed density | 2.1 ± 0.1 g/cm³ |
|---|---|
| Compressive strengthASTM C579 | ≥ 95 MPa @ 7 days |
| Flexural strengthEN 13892-2 | ≥ 30 MPa @ 7 days |
| Tensile strengthBS 6319-7 | ≥ 17 MPa @ 7 days |
| Pot life | 50 - 70 min |
| Foot traffic | After 24 hr |
| Vehicular traffic | After 72 hr |
| Full chemical cure | 7 days |
| Bond strength on C20/25 concreteEN 1542 | ≥ 2 MPa @ 7 days (concrete failure) |
| Maximum wear depthEN 13892-4 | ≤ 0.05 mm |
| Impact resistanceISO 6272-2 | Pass @ 10 N.m @ 7 days |
| Shore D hardnessASTM D2240 | ≥ 80 |
| VOCASTM D2369 | ≤ 20 g/ltr (comply with LEED) |
Standards and approvals
KingFloor EP100T complies with EN 13813, Class SR- B2.0-AR0.5-IR10.
How to use
Substrate preparation
The substrate must be clean, dry, even, dense and free from oil, grease, dust and other contaminants. A clean surface will ensure maximum adhesion between the substrate and the coating.
Concrete floors must have a minimum compressive strength of 25 N/mm² and a maximum concrete relative humidity of 80% (max. moisture content of 4%), relative humidity can be measured by using hygrometers.
Concrete relative humidity should be less than 80% for concrete of 28 days old or more, for low W/C ratio concrete floors, 80% hygrometer reading or less can be achieved before 28 days age. Contact KINGKRETE Technical Department for further details.
Surface preparation
Unsound layers and contaminated concrete surfaces must be prepared using mechanical surface removing equipment. In case of areas deeply contaminated by oil or grease, such areas should be treated with hot compressed air.
Priming
Concrete substrates should be primed with KingFloor Primer. Use lambs wool roller to apply the primer. More than one coat may be required for highly porous or textured surfaces.
Work the primer well into the surface of the concrete and whilst the primer is wet, dress the surface with Antislip Aggregates #3 at the rate of 0.5 kg/m² and allow to touch dry.
Another prime coat shall be applied just before applying the mixed KingFloor EP100T to ensure a strong bond between the primer coat and the top coat.
Mixing
Transfer the entire contents of the colour pack into the base container and mix till a uniform colour is achieved. Add the contents of the KingFloor EP100T Hardener into the base container and using a jiffy-type mixer attached to a slow running electric drill, mix for approximately 2 minutes.
Then transfer the entire contents of the base container into a Casco or Creteangle-type mixer, ensuring that the bottom and sides are thoroughly scraped.
Start the mixer and add the entire contents of the KingFloor EP100T Filler container, ensuring that this is completely dry and lump-free. Continue mixing for approximately 2 minutes.
Important: Never mix by hand as this could lead to areas of uncured material.
Application
Once mixing is complete, transfer the KingFloor EP100T to the uncured primed surface and using a straight- edged steel trowel, apply it evenly.
The use of KingKrete Solvent when used to clean the trowel will also aid in producing a tight closed surface.
Important: When applying each kit of KingFloor EP100T, leave approximately 200 mm of the closest working edge untrowelled as this will help the blending in of the next kit. Avoid excessive trowelling as this can lead to marks resembling burns on the surface.
REMARKS
- KingFloor EP100Tshould not be applied on to surfaces known to suffer from damp rising.
- KingFloor EP100T should not be applied at temperatures below 10°C or where ambient relative humidity exceeds 80%.
Cleaning
KingFloor EP100T can be removed by KINGKRETE solvent prior setting.
Coverage, packaging and storage
Coverage
KingFloor EP100T: Approximately 2.75 - 3.00 m²/kit @ 5 mm thick.
KingFloor Primer: 5 m²/kg.
Packaging
KingFloor EP100T "natural" is available in 29.35 kg packs (14 litre).
KingFloor EP100T "coloured" is available in 30 kg packs (14.3 litre) including colour pack.
KingFloor Primer is available in 5 kg packs.
THICKNESS RANGE
2 - 5 mm.
Storage
Shelf life is 1 year when stored under cover, out of direct sunlight and protected from extremes of temperature. Failure to comply with the recommended storage conditions may result in premature deterioration of the product or packaging. For specific storage advice consult KingKrete's Technical Services Department.
Health and safety
As with all chemical products, care should be taken during use and storage to avoid contact with eyes, mouth, skin and foodstuffs. Treat splashes to eyes and skin immediately. If accidentally ingested, seek medical attention. Reseal containers after use. Use in well ventilated areas and avoid inhalation.