Railways
Stations, track, viaducts, depots and underground sections. Which part are you working on?
- 1ProjectRailways
- 2Area
- 3Systems & products
Concrete Admixtures
Structural concreteFrames, slabs, columns and walls: workability, strength and durability.
14 matches →
Ready-mix superplasticiser rangeThe KingMix polycarboxylate (PCE) range for ready-mix and site-batched concrete. Grades differ in water reduction, slump retention and early strength; your KingKrete engineer matches the grade to your cement, aggregates and placing time.
48 matches →
Precast & early-strength concreteFast mould turnaround and early strength for precast elements.
17 matches →
Sprayed concrete (shotcrete)Tunnel linings, slopes and shafts placed by spraying.
3 matches →
Cold-weather concretingAccelerating and antifreeze admixtures for concreting in low temperatures.
5 matches →
Hot-weather concretingFor: summer pours in high temperatures: slump retention and controlled setting.
13 matches →
Self-compacting concreteFor: congested reinforcement and fair-faced elements placed without vibration.
3 matches →
Corrosion-protected concreteFor: reinforced concrete exposed to chlorides from sea air, de-icing or car traffic.
2 matches →
Concrete Surface Treatments
Curing of slabs & decksCuring compounds that protect fresh concrete as it gains strength. Remove the curing film before any bonded screed, coating or tiling.
11 matches →
Formwork releaseRelease agents for clean striking of cast-in-place formwork.
5 matches →
Evaporation control in hot weatherFor: fresh slabs in sun and wind: stops plastic-shrinkage cracking before curing starts.
3 matches →
Concrete Repair & Strengthening
Cosmetic fairing coatFor: blemish repair before paint, low structural demand.
4 matches →
Pinhole and surface fillingFor: before protective coating.
3 matches →
Structural repair, vertical or overheadFor: high strength, trowel-grade.
4 matches →
Structural repair, horizontal or formedFor: high strength, large volume, free-flow.
3 matches →
Rapid-turnaround repairFor: fast return to service or traffic.
3 matches →
Steel reinforcement primingFor: exposed or corroding rebar before patching.
4 matches →
Structural crack injectionFor: dry, static cracks 0.2-10mm.
2 matches →
Wet or moving crack injectionFor: active leaks, live/moving cracks.
2 matches →
Epoxy structural bonding and patchingFor: vertical/overhead, maximum strength.
4 matches →
Structural strengthening (CFRP)Carbon-fibre plates and wraps to add capacity to beams, slabs and columns.
6 matches →
Floor & joint-arris repairRapid repair of damaged floor slabs and joint edges.
24 matches →
Active water leak pluggingFor: immediate stop to running water.
2 matches →
Manhole cover reinstatementFor: heavily trafficked areas, rapid turnaround.
1 match →
Column and beam jacketingFor: enlarging or encasing columns and beams with flowable micro-concrete.
8 matches →
Sprayed concrete repairFor: large areas of spalled soffits and walls, rebuilt by spraying.
7 matches →
Grouts & Anchors
Post-tensioned cable duct groutingFor: eN 447 compliance required.
1 match →
Precision and crane rail groutingFor: high ambient temperature up to 55°C.
3 matches →
Structural anchoringFor: cracked or uncracked concrete, seismic-rated.
2 matches →
Pile top fairing and void fillingFor: high-flow pourable grout.
3 matches →
Rail & crane-rail fixingsGrouting rail fastenings, crane rails and sole plates.
28 matches →
Bearings & base platesGrouting bridge bearings, column base plates and plinths.
28 matches →
Precast concrete unit jointsFor: voids and gaps between precast elements.
2 matches →
General-duty anchoringFor: handrails, dowels, non-structural fixings.
4 matches →
Balustrade & handrail post fixingFor: posts, balustrades and railings set into concrete or stone.
5 matches →
Joint Sealants
Pavement and runway jointsFor: fuel and oil exposure, trafficked.
9 matches →
Exterior movement jointsFor: weather-exposed, high movement.
10 matches →
Glazing and curtain wall jointsFor: perimeter seal, exterior exposure.
8 matches →
Wet area jointsFor: bathroom, kitchen, tile perimeter.
9 matches →
Car park and trafficked deck jointsFor: horizontal, vehicle traffic.
11 matches →
Fire-rated joints & penetrationsFor: joints and service penetrations in fire-rated walls and floors.
2 matches →
Protective Coatings
Flooring
Terminal Floors & ConcoursesFloor systems for terminal floors & concourses.
3 matches →
Platforms & UndercroftFloor systems for platforms & undercroft.
2 matches →
Ramps & LinksFloor systems for ramps & links.
2 matches →
Plant rooms & workshopsHard-wearing, oil-resistant floors for plant and workshops.
22 matches →
Line marking & safety areasMarking, walkways and slip-resistant safety finishes.
4 matches →
Control RoomsFloor systems for control rooms.
2 matches →
Anti-static & ESD floorsConductive and dissipative floors for server, control and electronics rooms.
5 matches →
Screeds & levellingCementitious screeds and self-levelling underlayments before the finish.
16 matches →
Waterproofing
Basements & FoundationsWaterproofing for: without hydrostatic pressure; with hydrostatic pressure; negative-side only.
20 matches →
Retaining WallsWaterproofing for: positive-side accessible; negative-side only.
19 matches →
RoofsWaterproofing for: non-exposed roof; exposed flat roof; exposed Sloped roof; roof garden / landscaped roof; sloped metal roof (profiled / standing seam).
34 matches →
Podium Slabs & DecksWaterproofing for: pedestrian traffic; vehicular traffic; landscaped / planter areas.
17 matches →
Wet AreasWaterproofing for: tiled wet areas; heavy wash-down / BOH areas.
22 matches →
Plant RoomsWaterproofing for: wet service areas; critical equipment areas.
6 matches →
Tunnel LiningsWaterproofing for: cut-and-cover / accessible; bored / limited access; high groundwater expected.
14 matches →
Joints (Construction & Movement)Waterproofing for: construction joints; expansion / movement joints.
23 matches →
Bridge DecksWaterproofing for: pedestrian traffic; vehicular traffic.
14 matches →
Substructures (Piers, Abutments, Foundations)Waterproofing for: with hydrostatic pressure; splash / tidal zone; aggressive ground conditions.
20 matches →
Drainage Structures (Culverts, Channels)Waterproofing for: gravity flow; permanently wet; aggressive / contaminated water.
14 matches →
Expansion & Movement Joints (Infrastructure)Waterproofing for: static construction joints; movement / seismic joints.
23 matches →
Lift Pits & SumpsWaterproofing for: maintainable pit acceptable; dry pit required (zero tolerance).
15 matches →
Water Tanks – ConcreteWaterproofing for: fire water; potable water; process / aggressive water.
16 matches →
Tile & Stone Adhesives and Grouts
Large-format tile fixingFor: heavy traffic floors, large or heavy tiles.
10 matches →
Large-format tile groutingFor: heavy traffic floors.
10 matches →
Wet area tile fixingFor: bathroom, kitchen, wet areas.
14 matches →
Wet area tile groutingFor: bathroom, kitchen, wet areas.
14 matches →
Dry interior tile fixingFor: living areas, dry floors and walls.
9 matches →
Dry interior tile groutingFor: living areas, dry floors and walls.
9 matches →
Adhesives, Mortars & Plasters
Not sure where to start?
Tell us about your project. Our technical team will recommend the right products and systems.