Bridges & Highways
Bridges, flyovers, viaducts and road infrastructure. Which part are you working on?
- 1ProjectBridges & Highways
- 2Area
- 3Systems & products
Concrete Admixtures
Structural concreteFrames, slabs, columns and walls: workability, strength and durability.
14 matches →
Ready-mix superplasticiser rangeThe KingMix polycarboxylate (PCE) range for ready-mix and site-batched concrete. Grades differ in water reduction, slump retention and early strength; your KingKrete engineer matches the grade to your cement, aggregates and placing time.
48 matches →
High-strength & high-rise concretePumped and high-strength mixes for towers and long spans.
18 matches →
Marine & chloride-exposed concreteConcrete in seawater, splash zones and chloride exposure.
7 matches →
Precast & early-strength concreteFast mould turnaround and early strength for precast elements.
17 matches →
Cold-weather concretingAccelerating and antifreeze admixtures for concreting in low temperatures.
5 matches →
Hot-weather concretingFor: summer pours in high temperatures: slump retention and controlled setting.
13 matches →
Self-compacting concreteFor: congested reinforcement and fair-faced elements placed without vibration.
3 matches →
Corrosion-protected concreteFor: reinforced concrete exposed to chlorides from sea air, de-icing or car traffic.
2 matches →
Piles & diaphragm wallsFor: bored piles and diaphragm walls: long workability and cohesive tremie concrete.
4 matches →
Concrete Surface Treatments
Curing of slabs & decksCuring compounds that protect fresh concrete as it gains strength. Remove the curing film before any bonded screed, coating or tiling.
11 matches →
Formwork releaseRelease agents for clean striking of cast-in-place formwork.
5 matches →
Evaporation control in hot weatherFor: fresh slabs in sun and wind: stops plastic-shrinkage cracking before curing starts.
3 matches →
Concrete Repair & Strengthening
Structural repair, vertical or overheadFor: high strength, trowel-grade.
4 matches →
Structural repair, horizontal or formedFor: high strength, large volume, free-flow.
3 matches →
Steel reinforcement primingFor: exposed or corroding rebar before patching.
4 matches →
Structural crack injectionFor: dry, static cracks 0.2-10mm.
2 matches →
Wet or moving crack injectionFor: active leaks, live/moving cracks.
2 matches →
Epoxy structural bonding and patchingFor: vertical/overhead, maximum strength.
4 matches →
Structural strengthening (CFRP)Carbon-fibre plates and wraps to add capacity to beams, slabs and columns.
6 matches →
Active water leak pluggingFor: immediate stop to running water.
2 matches →
Marine & splash-zone repairRepairs to piles, decks and quay walls in seawater.
28 matches →
Manhole cover reinstatementFor: heavily trafficked areas, rapid turnaround.
1 match →
Column and beam jacketingFor: enlarging or encasing columns and beams with flowable micro-concrete.
8 matches →
Sprayed concrete repairFor: large areas of spalled soffits and walls, rebuilt by spraying.
7 matches →
Grouts & Anchors
Post-tensioned cable duct groutingFor: eN 447 compliance required.
1 match →
Pile top fairing and void fillingFor: high-flow pourable grout.
3 matches →
Structural anchoringFor: cracked or uncracked concrete, seismic-rated.
2 matches →
Bearings & base platesGrouting bridge bearings, column base plates and plinths.
28 matches →
Precast concrete unit jointsFor: voids and gaps between precast elements.
2 matches →
Balustrade & handrail post fixingFor: posts, balustrades and railings set into concrete or stone.
5 matches →
Joint Sealants
Protective Coatings
Waterproofing
Bridge DecksWaterproofing for: pedestrian traffic; vehicular traffic.
14 matches →
Substructures (Piers, Abutments, Foundations)Waterproofing for: with hydrostatic pressure; splash / tidal zone; aggressive ground conditions.
20 matches →
Drainage Structures (Culverts, Channels)Waterproofing for: gravity flow; permanently wet; aggressive / contaminated water.
14 matches →
Expansion & Movement Joints (Infrastructure)Waterproofing for: static construction joints; movement / seismic joints.
23 matches →
Retaining WallsWaterproofing for: positive-side accessible; negative-side only.
19 matches →
Not sure where to start?
Tell us about your project. Our technical team will recommend the right products and systems.