Task at Hand
Jaipur Metro Project C-2 is considered one of the fastest metro projects implemented in the world. High-performance structural grouts, repair systems, protective coatings, and admixtures that make a faster and stronger build were highly required by this project. KingKrete supplied several products of great value for finishing and maintenance — products such as KingForm 100S , KingGrout GP60 , KingExtra LC30 , and KingFiber PP75 exceeded the client's expectations.
KingKrete Solution
To improve the concrete finish, KingKrete delivered KingForm 100S — a release agent appropriate for most types of formwork, with multiple advantages that enhance the usable life of the formwork.
Used within the concrete mix to control shrinkage cracks and act as an alternative to traditional crack-control steel mesh.
A general-purpose, non-shrink, chloride-free cementitious grout with high early strength — the solution for all pumpable and pourable requirements: stanchion bases, struts, railings, guardrails, filling of shutter-rod openings, and anchoring of bars and bolts.
Formulated specially as a primer for concrete pumps and pipelines before concreting — creating a thin lubrication film inside these elements to reduce friction and prevent blockages.
Products & Quantities
| Product | Quantity Supplied | Area / Coverage |
|---|---|---|
| KingGrout GP60 | 190 kg | 0.0826 m³ |
| KingFiber PP75 | 349 units | — |
| KingKure 70W | 700 kg | 3,500 m² |
| KingExtra LC30 | 120 kg | 32,728 linear m |
| KingRep WS | 300 kg | — |
| KingMix 711PC | 9,000 kg | — |